Innovative Modular Delivers Space-Efficient Learning To Greenwith Primary
The new modular buildings at Greenwith Primary School were designed by Sarah Constructions with Das Studio, in collaboration with Bestec and Innovis Engineers. Built using cutting edge modular construction methods for the wall, floor and roofing support systems, these components were made off-site in the dedicated Sarah workshop, then transported and assembled on-site.
The scope of the project included demolition of the existing ageing infrastructure and construction of the new two-storey modular building, featuring general and serviced learning areas, a performance space, practice/withdrawal rooms, breakout spaces, teacher preparation space, landscaping and disability access toilets.
For Greenwith Primary School, this project is an important part of meeting their vision to be a school of excellence within the community and the SA Education System. This project showcases Sarah’s excellence in delivering innovative modular construction solutions.