Interior Design: After reviewing the joinery design in Buildings 1 and 2, Sarah suggested replacing some cupboards with drawers, enhancing functionality at no additional cost. Similarly, the team suggested modifications to the flooring installation methodology, improving maintenance outcomes and reducing whole-of-life costs.
Above Ground Carpark Structures: The apartments feature above ground parking facilities, hence the construction methodologies and materials required adaption to accommodate the transfer structure and load bearing. Sarah’s team developed alternative composite floor plates using steel frames and hollow concrete slabs, and mitigated program impacts by pouring the higher slabs in a single pour and reprogramming the roofing sequence.
Digital Keyless Entry to Building and Apartments: All apartments feature digital, keyless entry technology for enhanced security and amenity; one of the first uses in residential apartments in South Australia, and the first time Sarah’s team had managed installation and commissioning. The team was required to develop comprehensive processes and checklists to ensure security of the apartments during construction, and efficient handover to the client.